House Update - All big stuff done!

We have now finished all the big stuff

  • The bay window has new weather boards
    Bay window with new weather boards
    Bay window with new weather boards
  • The room as a new chipboard floor surface
    Room with new chipboard floor surface
    Room with new chipboard floor surface

And some small things

  • Replaced the larger plaster board. It was damaged when replacing the stud it was attached to.
    Wall with new plaster board in place
    Wall with new plaster board in place
  • Replaced the small plaster board pieces that are behind the skirting board
  • Michaela has done the first coat of plastering over all those edges

Stuff to go

  • Finish the plastering
  • Put all skirting boards type stuff back
  • Undercoat/topcoat inside
  • Undercoat/topcoat outside
  • Put concrete board that is part of the eves over the bay window