House Update

Saturday was spent working on the house again.  The end result was 1.4 m wall section replaced (foundation board and wall base board) and three joists in place (plus a 4”x 2” at the end of these).

All this can been seen in this photo:

Photo of floor - with more joists
Photo of floor - with more joists

The wall being on the top-left and the extra board being on the bottom-right, with the three joists being those in the middle of the picture.

Work left is:

  • two joists at the bottom-left on picture
  • the missing joist from the top-right of picture
  • 1.3 m of wall
  • an internal wall joist (saving the easy parts till last)

Then a floor can go down, but before that, a PVC layer will be rolled out and sealed with vast amounts of tape. Roll on the weekend. or was that the weak-end to this post….